Mission School District
A boiler-heated school. A provincial mandate to be carbon-free by 2035. A post-COVID requirement for significantly more fresh air, with zero tolerance for disrupting students or staff.
Our team partnered with Fujitsu and the mechanical engineer to design a custom variable refrigerant flow retrofit that fit inside the existing air handlers, the first of its kind in Canada.
The result: dramatic natural gas savings, full mandate compliance, and a model BC Hydro is now studying for the rest of the school district.
Featured in the upcoming national edition of Mechanical Business magazine.


